* [ECOS] scheduler started?
@ 2011-03-03 12:22 Slide
0 siblings, 0 replies; only message in thread
From: Slide @ 2011-03-03 12:22 UTC (permalink / raw)
To: ecos-discuss
Back in 2009, this [1] message told one way to know if the scheduler
was already started. Is this still the recommended method for doing
so? Also, I notice in my usage that if I call something like
sched_yield before the scheduler is started, it causes problems. Would
it be possible to add code internally to sched_yield and it's friends
to check if the scheduler is started before actually initiating the
yield (or other similar functionality)?
Thanks,
slide
[1] - http://sourceware.org/ml/ecos-discuss/2009-06/msg00105.html
--
Before posting, please read the FAQ: http://ecos.sourceware.org/fom/ecos
and search the list archive: http://ecos.sourceware.org/ml/ecos-discuss
^ permalink raw reply [flat|nested] only message in thread
only message in thread, other threads:[~2011-03-03 12:22 UTC | newest]
Thread overview: (only message) (download: mbox.gz / follow: Atom feed)
-- links below jump to the message on this page --
2011-03-03 12:22 [ECOS] scheduler started? Slide
This is a public inbox, see mirroring instructions
for how to clone and mirror all data and code used for this inbox;
as well as URLs for read-only IMAP folder(s) and NNTP newsgroup(s).